Lunch + Learn Agenda
- Benjamin Mengden
- Mar 19
- 2 min read
Updated: Mar 20

I've been preparing for a lunch and learn with a firm that Accipiter has been contracted with. The lunch and learn has 3 major categories:
SOP and Best Practices for Architects
SOP and Best Practices Using Revit
Anatomy of Construction Documents
The full agenda document is cut and pasted below. More detail is intended. This is more of a brain dump than anything.
CONSTRUCTION DOCUMENTS AS CONTRACT DOCUMENTS
SHEETS IN SET
COVER SHEET
ABBREVIATIONS
PROJECT LOCATION MAP
POSSIBLY PROJECT PERSPECTIVE
UTILITY PROVIDERS
RELEVANT CODES
PROJECT TEAM
CODE SHEET?
GENERAL CONDITIONS + NOTES?
LIFE SAFETY
PHASE PLAN - IF NEEDED
SURVEY WITH DISCLAIMER
SITE PLAN EXISTING OR DEMO
SITE PLAN - CAN INCLUDE SCOPE DELINEATION
SITE DETAILS
FLOOR PLAN BY LEVEL
DEMO PLAN
DIMENSIONAL FLOOR PLAN
PARTITION OR WALL TYPES
ROOF PLAN
FINISH PLAN BY LEVEL
RCP BY LEVEL
SUPPORT BUILDINGS OR SITE STRUCTURES (ELEVATIONS, SECTIONS, PLANS, ENLARGED PLANS, DETAILS
ENLARGED PLANS
PLAN DETAILS
FURNITURE PLAN - DISCLAIMER THAT THIS IS A COURTESY - DON'T STAMP
EXTERIOR ELEVATIONS
INTERIOR ELEVATIONS
MILLWORK SECTIONS (CAN BE PART OF SECTIONS IF PREFERRED)
BUILDING SECTIONS
WALL SECTIONS
SECTION DETAILS
DOOR + WINDOW SCHEDULE (GRAPHIC + LIST) - SEE ADDITIONAL NOTE BELOW
FIXTURE LIGHTING EQUIPMENT SCHEDULES IF NEEDED AND NOT IN MEP
HEAD SILL JAMB DETAILS
ALL SUBS DRAWINGS:
CIVIL
LANDSCAPE
STRUCTURAL
MECHANICAL
PLUMBING
ELECTRICAL
AV
SPECIALTY - POOL
FINISH SCHEDULE
FLOOR
CEILING
WALL
BASE
TRIM
MILLWORK
TRANSITION
ITEMS SUCH AS CORNER TREATMENT IF NOT IN SPECS
ITEMS SUCH AS DRYWALL REGLETS CAN BE TRIM OR IN SPECS
DOOR SCHEDULE FIELDS
NUMBER
LEVEL?
LOCATION?
WIDTH
HEIGHT
THICKNESS ?
TYPE
MATERIAL
FINISH
FRAME TYPE
FRAME MATERIAL
FRAME FINISH
HEAD DETAIL REFERENCE
JAMB DETAIL REFERENCE
SILL DETAIL REFERENCE
CONTROLLED ACCESS?
HARDWARE SET
FIRE RATING
COMMENTS
DOOR HARDWARE CAN OFTEN BE FILLED OUT BY A CONSULTANT/REP
SPECS AND DRAWINGS NEED TO BE COORDINATED
SPECS ARE AN INTEGRAL PART OF THE CONTRACT AND CAPABILITY TO CONTROL QUALITY OF BUILDING - LOW END CONTRACTORS
CONTRACTS
SUBS COORDINATION
WORKING DRAWINGS
STAMP MANAGEMENT
REVIT MODELING BEST PRACTICES
EVEN DIMENSIONS
LEVELS + GRIDS
UNIT MANAGEMENT
COORDINATION WITH SUBS
SHEET INSERTION POINT
FAMILY LIBRARY
TEMPLATES
NAMING CONVENTIONS
KEYNOTES
ELEMENT
MATERIAL
USER
KEYNOTE RELOAD FILE REFRESH PROCESS
ABBREVIATION CONVENTION
COURSING OUT MATERIALS
CONVERSION FROM ONE PLATFORM TO REVIT
VIEW TEMPLATES
PHASES
DEMO CAPABILITIES
OPTIONS
WORKSHARING
BACKUPS
OPENING FILES AND PINNING RECENT
MOVING ITEMS USING DISTANCE RATHER THAN VISUAL
MOVING THINGS BY REFLECTION AND ALIGNMENT
PINNING AND LOCKING
LOCKING CRITICAL DIMENSIONS AND CONSTRAINING DESIGNS TO DESIGN INTENT
WINDOWS VS CURTAIN WALLS VS STOREFRONT SYSTEMS
NOTES VS KEYNOTES VS LEGENDS
RECORD FILE STORAGE
NOTES
CONTRACTS
MEETING NOTES AND DOCUMENTATION OF PROCESS
INTERNATIONAL WORK
SPANISH CAPACITY
AI
PROPOSALS - STREAMLINE AND AUTOMATE
FORMS - AUTOMATE
NEWSLETTER
SIGNS AT JOB SITES
REVIT OPTIONS
SPACE DELINEATION
PROGRAMMING SCHEDULE - SCHEDULE OF INITIAL CLIENT WANTS
PROJECT INFORMATION TO THE MAX
LOCATION ACCURACY
TOPOGRAPHIC INFORMATION
FULL FRAMING MODEL
NONTRADITIONAL VIEWS
RHINO REVIT INTEGRATION
SKETCHUP REVIT INTEGRATION
MATERIAL TAKEOFFS
SOLAR ANALYSIS